Misión Verdad MV Editor’s note: Between March 7th and 10th of 2019, Venezuela experienced the longest interruption of its electric system in the country’s history, as a result of a sabotage directed against the central computer of the main hydroelectric power station (El Guri, Bolívar State). The cruelty of the attack and its impact on…
— Read on libya360.wordpress.com/2019/03/26/reconstructing-the-history-of-electrical-sabotage-in-venezuela/